1958 Lockheed C-130A "Hercules"
s/n 3212 Reg: N131EC
This is the only civilian FAA approved C-130A in the world. It can be sold to only U.S. government approved countries. Approved End User License Required.
Specifications
Airframe:
11,615 Total Time Since New
2,324 Hrs Since Lockheed Anti-Deterioration Service Check
751 Hrs Since last "D" Check
9,362 Landings Since New
Engine #1:
Allison T-56A-11
225 SOH
10 SHSI
Engine #2:
Allison T-56A-11
775 SOH
10 SHSI
Engine #3:
Allison T-56A-11
470 SOH
10 SHSI
Engine #4:
Allison T-56A-11
1150 SOH
10 SHSI
Prop #1:
Aero Products
1080 "s" time since spalling & NDI Insp.
Prop #2:
Aero Products
1200 "s" time since spalling & NDI Insp.
Prop #3:
Aero Products
1285 "s" time since spalling & NDI Insp.
Prop #4:
Aero Products
875 "s" time since spalling & NDI Insp.
Propellers have been timed at half-life – approximately 1500 hours remaining until the next inspection is due, as per FAA approved inspection program
Ground Compressor Turbine (GCT)
170.0 Hrs SMOH
Avionics:
*DUAL COLLINS 618‑S ‑ HRS*SCR 718 RANGE
*COLLINS VHF 10 - VHF*AN/APN 22 LO RANGE RAD ALT
*AN/ARC 34 - UHF*AN/APX 6 ‑ IFF
*AN/ARN 59 - RADAR*MA 1 ‑ FLIGHT DIRECTOR
*AN/ARN 14 VOR*AN/ARN 21 - TACAN
*DUAL AN/ARN 6 ‑ ADFS*AN/ARN 32 - MARKER BEACON
*AN/ARN 31 ‑ UHF/DF*KINGTRANSPONDER
*AN/ARN 31 – GS*ENCODER
*AN/APN 147 DOPPLER RADAR*KING VHF COM
*AN/ASN 35 DOPPLER COMPUTER
TCAS: Honeywell TCAS 2 version 7
GPS: Becker Multi Function Display GPS worldwide
COMMS: dual SunAir HF's with 8.33 spacing and the Navs have FM immunity
RADAR: APN-59
Payload:
Payload: 30,000 lbs.
41' long floor (4 pallets)x 10' W x 9' H + 1 ramp regular pallet 88x108
Certification:
FAA Part 91, 501 subpart F approved maintenance inspection program.
Full set of maintenance and inspection manuals. This is the only C-130A in the world with FAA civilian certification.
Maintenance: AAIP inspection program with a master minimum equipment list.
Cargo system: Complete LAPES roller system, the only one in the world in civilian hands.
Troop seats: Complete set of troop seats (96) including complete set of stanchions for litters.
Air Drop Capability: All components for paratroop operations.
Hours Since Respar:
Hours since Lockheed wing rehabilitation program was completed: 2,449
Date when Lockheed wing rehabilitation program was completed: Aug 1975
Hours when wing spars were replaced: 5,138
Date when wing spars were replaced: Dec. ‘71
Hours when wing, planks were replaced: 5,138
Date when wing planks were replaced: Dec, '71
Additional Equipment:
*COMPLETE DUAL RAIL CARGO SYSTEM - CONEX COMPATIBLE
*PARATROOPER DOORS
*PARATROOPER HARNESS RETRIEVAL SYSTEM
*JATO SYSTEM (ATO)
*SHATS: PAX/PARA - 110
Location: Louisiana